Hello everyone,
Our final inspection is coming up soon, and we’re wondering if we need to prepare anything or keep anything in mind.
So far, we have listed all the minor defects – mostly the tiler made a bit of a mess.
Additionally, we have reported a roller shutter where the slats extend beyond the casing edge and cause some rattling – I’m worried the motor might be affected by this.
Also, one socket of a double outlet doesn’t work, and another has a child safety lock that is too secure (it’s impossible to bypass).
Other than that, there are small cracks between the drywall and the wall (this seems to be due to the unfortunate construction and isn’t really noticeable).
The retractable attic ladder is a bit stiff when closing – but that was more of a discussion between the construction manager and the carpenter. It will likely be noted as well.
There is a slightly larger crack between an internal and an external wall, which we will bring up.
Some items like stair railings and the porch roof are still missing – but those will also be documented. We have already done a preliminary walk-through with the construction manager.
The construction manager wanted to convert the attic during the inspection and was excited about how spacious it is 😀
We are wondering if it still makes sense to hire an expert or if that would be a waste of effort. All parts of the scope of work have been completed.
Defects that appear later – as I understand it – are covered by the warranty.
Some tradespeople said it’s common to check again after two years for settlement cracks or similar issues and have those fixed. However, the scope of work states:
The warranty period for the building is five years.
The contractor points out that, according to applicable legal regulations, they are not liable for building physics phenomena whose occurrence cannot be excluded even with construction executed according to all technical standards.
This particularly includes cracking of elastic joints, cracks in solid wood, plaster, and other building components.
For me, this means such defects are actually not covered by the warranty, or am I mistaken? In other words, I would have to prove that a settlement crack was caused by a defect and not by the natural settlement behavior of calcium silicate blocks or similar – which will be difficult.
Other than that, I am considering whether to mention the differing screed insulation on the ground and upper floors – we were not consulted on this, and it deviates from the scope of work. On the other hand, it doesn’t really bother me… probably just a matter of being right.
What are your opinions, thoughts, suggestions regarding the final inspection?
How was it for you? Were you accompanied, or were many issues still open?
Best regards.
Our final inspection is coming up soon, and we’re wondering if we need to prepare anything or keep anything in mind.
So far, we have listed all the minor defects – mostly the tiler made a bit of a mess.
Additionally, we have reported a roller shutter where the slats extend beyond the casing edge and cause some rattling – I’m worried the motor might be affected by this.
Also, one socket of a double outlet doesn’t work, and another has a child safety lock that is too secure (it’s impossible to bypass).
Other than that, there are small cracks between the drywall and the wall (this seems to be due to the unfortunate construction and isn’t really noticeable).
The retractable attic ladder is a bit stiff when closing – but that was more of a discussion between the construction manager and the carpenter. It will likely be noted as well.
There is a slightly larger crack between an internal and an external wall, which we will bring up.
Some items like stair railings and the porch roof are still missing – but those will also be documented. We have already done a preliminary walk-through with the construction manager.
The construction manager wanted to convert the attic during the inspection and was excited about how spacious it is 😀
We are wondering if it still makes sense to hire an expert or if that would be a waste of effort. All parts of the scope of work have been completed.
Defects that appear later – as I understand it – are covered by the warranty.
Some tradespeople said it’s common to check again after two years for settlement cracks or similar issues and have those fixed. However, the scope of work states:
The warranty period for the building is five years.
The contractor points out that, according to applicable legal regulations, they are not liable for building physics phenomena whose occurrence cannot be excluded even with construction executed according to all technical standards.
This particularly includes cracking of elastic joints, cracks in solid wood, plaster, and other building components.
For me, this means such defects are actually not covered by the warranty, or am I mistaken? In other words, I would have to prove that a settlement crack was caused by a defect and not by the natural settlement behavior of calcium silicate blocks or similar – which will be difficult.
Other than that, I am considering whether to mention the differing screed insulation on the ground and upper floors – we were not consulted on this, and it deviates from the scope of work. On the other hand, it doesn’t really bother me… probably just a matter of being right.
What are your opinions, thoughts, suggestions regarding the final inspection?
How was it for you? Were you accompanied, or were many issues still open?
Best regards.
N
nordanney7 Feb 2016 21:53Settlement cracks or cracks in flexible joints are almost certainly to be expected. That is why joint work is often carried out only after a certain period of time. We are currently doing this—almost two years after moving in. Now a few settlement cracks are also being "repaired," as we only have plastered walls.
The silicone joint at the tile baseboards will initially be left out on our side as well – otherwise, we have few joints in that sense; mainly just the connections between the drywall panels and the masonry.
You didn’t paint your walls, right? Or what do you mean by "only plastered"?
You didn’t paint your walls, right? Or what do you mean by "only plastered"?
B
Bieber08157 Feb 2016 23:05BeHaElJa schrieb:
Your opinions, thoughts You are being too lenient! I can definitely see myself in this. Too thoughtful... Put real pressure on those you paid a lot of money to for the construction work. There are no minor defects. A defect is a defect and it must be fixed.
D
Doc.Schnaggls8 Feb 2016 09:26Hello,
If I were you, I would thoroughly clean all windows and glass doors and carefully check for any defects (inclusions) or damage to the glass (scratches, etc.) as well as the frames.
For example, in our case, a tradesperson (who could not be identified) used an angle grinder in the living area and caused 3 (!!!) panes to be marked with unsightly “burn marks” from the glowing metal particles.
Regards,
Dirk
If I were you, I would thoroughly clean all windows and glass doors and carefully check for any defects (inclusions) or damage to the glass (scratches, etc.) as well as the frames.
For example, in our case, a tradesperson (who could not be identified) used an angle grinder in the living area and caused 3 (!!!) panes to be marked with unsightly “burn marks” from the glowing metal particles.
Regards,
Dirk
Similar topics