Hello. We have an excavation measuring 1.20m by 1.20m and 1.80m (4 ft 11 in) deep. Naturally, there was also loam soil at the bottom. There was a pipe down there that was removed.
Now it needs to be backfilled, and I wanted to ask what material I can use. Can I put back everything that was taken out? For example, the loam soil is no longer soft, so it should fill properly.
It must not become unstable because construction will start right next to it soon.
Now it needs to be backfilled, and I wanted to ask what material I can use. Can I put back everything that was taken out? For example, the loam soil is no longer soft, so it should fill properly.
It must not become unstable because construction will start right next to it soon.