ᐅ Complete structural engineering report for the building authority?

Created on: 25 Mar 2020 10:47
H
hegi___
H
hegi___
25 Mar 2020 10:47
Hello,

due to current circumstances, no one is available.

Does the complete structural calculation including drawings need to be submitted with the building permit application, or is only the structural engineer’s declaration required?

Thank you in advance
L
Lumpi_LE
25 Mar 2020 11:18
Depending on the federal state, such as Bavaria, Saxony, or Thuringia, the complete structural engineering documentation must be submitted before the start of construction; however, additional plans beyond those required for the building permit / planning permission are not necessary.
H
hegi___
25 Mar 2020 11:42
Okay, thank you.
I am referring to the plans created by the structural engineer for reinforcement and details.
T
Tassimat
25 Mar 2020 12:28
Is there any reason not to simply submit all the documents?
L
Lumpi_LE
25 Mar 2020 12:34
hegi___ schrieb:

Plans prepared by the structural engineer for reinforcement and details
only if there is a requirement for inspection.