Hello everyone,
I would like to ask the experts for an assessment of our offer (A1, A2, A3) – as far as it is technically and financially feasible.
We want to fully cover the south side of the roof (total 6.4 kWp (kilowatt peak)) without storage. Since we will also be getting a heat pump (SG ready), we want to supply it with photovoltaic power.
The system can be installed directly at the beginning of September, right after the roofer’s work is finished. It will be handled and carried out by an acquaintance who is always available to support us with advice and assistance. We are newcomers in this field ourselves.
With a total net cost of 10,000 €, I calculate an average of €1,562.50 per kWp.
Title 02 in the summary refers to the Home Manager, not to the energy storage (which I had removed from the offer, as it was originally included).
I look forward to your feedback.
Best regards,
Christian



I would like to ask the experts for an assessment of our offer (A1, A2, A3) – as far as it is technically and financially feasible.
We want to fully cover the south side of the roof (total 6.4 kWp (kilowatt peak)) without storage. Since we will also be getting a heat pump (SG ready), we want to supply it with photovoltaic power.
The system can be installed directly at the beginning of September, right after the roofer’s work is finished. It will be handled and carried out by an acquaintance who is always available to support us with advice and assistance. We are newcomers in this field ourselves.
With a total net cost of 10,000 €, I calculate an average of €1,562.50 per kWp.
Title 02 in the summary refers to the Home Manager, not to the energy storage (which I had removed from the offer, as it was originally included).
I look forward to your feedback.
Best regards,
Christian
D
Deliverer19 Jun 2022 15:56That would then be "by the 7th calendar year," right?
D
Deliverer19 Jun 2022 16:11"Upon completion of the fifth full calendar year." ;-)