I have received an offer from an architect for the planning of a single-family house (approximately 200 m² (2,150 sq ft)) and would like to hear your experiences and opinions about the offer.
The proposal includes services phases 1–4 for €4,000 plus VAT.
Drainage planning – €600 plus VAT.
Structural engineering without deep foundation – €1,800 plus VAT.
Total = €7,616 including VAT.
Is this offer reasonable, and is there anything else I should consider?
Thank you in advance.
I have received an offer from an architect for the planning of a single-family house (approximately 200 m² (2,150 sq ft)) and would like to hear your experiences and opinions about the offer.
The proposal includes services phases 1–4 for €4,000 plus VAT.
Drainage planning – €600 plus VAT.
Structural engineering without deep foundation – €1,800 plus VAT.
Total = €7,616 including VAT.
Is this offer reasonable, and is there anything else I should consider?
Thank you in advance.
O
Osnabruecker22 May 2023 10:25In terms of cost, it is below the HOAI, so the price is low.
Whether the service/quality is also low cannot be determined with the limited information available.
Whether the service/quality is also low cannot be determined with the limited information available.
Frosti2 schrieb:
Services offered for phases 1-4 If you are not able to do this yourself, you should also apply for phase 5. Phase 4 only covers the essentials required for the building permit / planning permission. The trades won’t be able to work much with it yet.
dertill schrieb:
If you can’t do it yourself, you should also apply for service phase 5. Service phase 4 only includes the essentials needed for the building permit / planning permission.
The trades don’t have much to work with from that yet. What exactly does service phase 5 include?
O
Osnabruecker22 May 2023 11:30Detailed design.
Stages 1-4 are until the building permit / planning permission is granted.
Stages 1-4 are until the building permit / planning permission is granted.
Whether design phase 5 is required (or possibly contracted twice) depends on the contractor/general builder/project manager. If it is a prefabricated house, phase 5 is often provided by this company. However, we do not have enough information about your building project. If this has already been discussed elsewhere, please link to it (but only within the forum), or please carefully complete the form for prospective builders.