ᐅ Flush-mounted video doorbell in external wall insulation system. Should it be pre-installed or prepared in advance?

Created on: 22 Jun 2023 20:18
S
sysrun80
S
sysrun80
22 Jun 2023 20:18
The external thermal insulation composite system (ETICS) is currently being installed on the construction site. The 10cm (4 inches) insulation boards have already been attached.

I plan to install a flush-mounted video door station. The device is about 5cm (2 inches) deep and weighs around 2 kilograms (4.4 pounds).

Question: Is it better to prepare for this installation now (and if so, how), or can it be cut out later without major problems?
M
Malunga
24 Jun 2023 13:33
We mounted equipment carriers from Kaiser directly onto the masonry. The insulation will be applied around it.
If the boards are already glued, only insulation anchors will be possible.
Alternatively, they can be glued again.
S
sysrun80
24 Jun 2023 16:17
Direct attachment to the masonry is probably difficult with an installation depth of 5cm (2 inches) and 10cm (4 inches) of insulation plus plaster.
M
Malunga
24 Jun 2023 16:24
sysrun80 schrieb:

Direct installation onto the masonry is probably difficult with a 5cm (2 inch) installation depth and 10cm (4 inch) insulation plus render.
That’s why device "carriers" are used. Just google and find the appropriate model.
S
sysrun80
24 Jun 2023 16:37
Malunga schrieb:

That’s why equipment “carriers”
Just google it and find the appropriate model

AHAA! Thanks! Didn’t know something like that even existed 🙂
S
sysrun80
24 Jun 2023 17:28
Unfortunately, I can't find a suitable one for the sizes. 100x220 is too small...

This is the installation layout I need


Technical drawing of a wall mounting board with drill holes and dimensions (270x122 mm, Ø17, Ø7)