ᐅ How much additional cost is expected based on the structural engineer’s calculations?
Created on: 11 Jun 2023 11:17
L
Lauralila88
Hello,
I have to admit that we approached the house construction quite naively...
We have already signed the detailed construction plans, and now the construction company wants us to waive our right to special termination in writing – is that even legal?
Now to the main question: we signed a fixed price contract (turnkey), but the site manager said that the price might change again after the structural engineer's calculations???? I mean, we won’t make any more changes to the plans, and we have already budgeted with the bank based on the known price – is this normal? It feels like buying a pig in a poke!
Best regards
I have to admit that we approached the house construction quite naively...
We have already signed the detailed construction plans, and now the construction company wants us to waive our right to special termination in writing – is that even legal?
Now to the main question: we signed a fixed price contract (turnkey), but the site manager said that the price might change again after the structural engineer's calculations???? I mean, we won’t make any more changes to the plans, and we have already budgeted with the bank based on the known price – is this normal? It feels like buying a pig in a poke!
Best regards
H
hanghaus202319 Jun 2023 13:49Lauralila88 schrieb:
Some neighbors built partly without a basement and partly with a concrete basement.At least you already knew that a concrete basement is necessary.H
hanghaus202319 Jun 2023 13:53Lauralila88 schrieb:
they said they can’t start the detailed planning otherwise.That would have meant for you that you wouldn’t have to pay if you cancel. Why do you think you were advised not to accept that?H
hanghaus202319 Jun 2023 14:00Lauralila88 schrieb:
We don’t have it in writing yet, but as soon as I do, I will post it.There is already something stated in the contract!!! I have requested this here several times.H
hanghaus202319 Jun 2023 14:10I'll try again. If you are building a waterproof concrete basement ("white tank"), make sure to have an expert (who is managing your construction supervision) oversee the building inspection. Just imagine how many mistakes can happen. It already starts during the planning phase.
L
Lauralila8819 Jun 2023 14:22hanghaus2023 schrieb:
I'll try again. If you are building a waterproof concrete shell (white tank), make sure to have an expert—someone who will take care of the site supervision for you—oversee the construction. You wouldn’t believe how many mistakes can be made. It already starts with the planning. We do have a site manager, and so far we are very satisfied with them.
L
Lauralila8819 Jun 2023 14:27hanghaus2023 schrieb:
It’s clearly stated in the contract!!! I have already requested this here multiple times.hanghaus2023 schrieb:
It’s clearly stated in the contract!!! I have already requested this here multiple times.Offer
as a single-family house
Plan revisions from 07.01.2023
CreativHAUS Classic 143.1 including basement
Solid construction “brick by brick” according to the Building Energy Act 11/2020
Exterior house dimensions 10.63 m x 9.23 m (35 ft x 30 ft)
Roof pitch 36°
Knee wall height 50/100 cm (20/40 inches)
Roof overhang 50 cm (20 inches)
Includes planning (building permit / planning permission application) – detailed design – structural engineering – energy certification – tendering
Includes excavation – drainage – insulation – backfilling
Includes independent construction management and site supervision
Excavation pit structural analysis by client
Note: For excavation pits 4.00 m (13 ft) deep or more, a verification analysis of the excavation pit is required – by client
Exterior landscaping, terraces, paths, parking spaces etc. by client
Slope stabilization, shoring work, as well as securing adjacent structures of any kind by client
Demolition and removal or disposal of existing structures of any kind by client
Disposal of excavated materials not needed or not reusable (see construction / scope description) by client
Costs and services resulting from requirements such as building permit / planning permission, structural engineering, earthquake zone classifications, and similar by client
Tile material price €35.00 per m² (tile sizes from 30 x 30 cm up to 60 x 60 cm) (€3.25 per sq ft)
Wide selection of front door models
Includes controlled ventilation system by Viessmann VitoVent 300 with heat recovery
Includes air-to-water heat pump Vitocal 200 A for indoor installation replacing gas/solar system
Includes underfloor heating in all living areas
Includes basement with light wells according to plan
I just copied this now, couldn’t manage it any other way