We are making progress, so hopefully I can soon contribute something to the subforum "Show Us Your Houses." For now, we are sticking to the plan, see attached. (I have noticed that two of the calendar week references are not correct.) We are building in the Leipzig district, postal code 0457x. If anyone has time and interest and would like to watch, please send me a message.* 🙂

Construction schedule week 12: date, week, trade, and tasks (e.g., assembly).


*@Moderator: I hope this is allowed. If not, please let me know. Thank you. 🙂
gutentag14 Mar 2022 10:31
I only see a schedule here. 😡

Please add more with pictures. 😎

Unfortunately, I can’t send a private message.
S
SoL
14 Mar 2022 10:42
What type of screed do you use regarding drying time?
P
Pinkiponk
14 Mar 2022 12:06
gutentag schrieb:

I only see a timeline here. 😡
Yes. 🙂 Did I do something wrong with that? I don’t understand your emoticon. As soon as the house is erected, there will be photos, and I will post them immediately in the relevant thread. After all, I have already been waiting 3 years to be able to contribute photos to that thread. 🙂 I didn’t dare to show even one photo of the foundation slab, despite thinking about it for a long time, because the thread is explicitly titled “Show us your houses.” 🙂
N
netuser
14 Mar 2022 12:34
SoL schrieb:

What type of screed are you using for the drying time?

A drying time of 6-7 weeks is planned.
W
WilderSueden
14 Mar 2022 12:36
I'm still not quite sure how to install the door frames three weeks before the scheduled assembly date 😉