Pinkiponk13 Mar 2022 10:23We are making progress, so hopefully I can soon contribute something to the subforum "Show Us Your Houses." For now, we are sticking to the plan, see attached. (I have noticed that two of the calendar week references are not correct.) We are building in the Leipzig district, postal code 0457x. If anyone has time and interest and would like to watch, please send me a message.* 🙂

*@Moderator: I hope this is allowed. If not, please let me know. Thank you. 🙂
*@Moderator: I hope this is allowed. If not, please let me know. Thank you. 🙂
P
Pinkiponk14 Mar 2022 12:06gutentag schrieb:
I only see a timeline here. 😡Yes. 🙂 Did I do something wrong with that? I don’t understand your emoticon. As soon as the house is erected, there will be photos, and I will post them immediately in the relevant thread. After all, I have already been waiting 3 years to be able to contribute photos to that thread. 🙂 I didn’t dare to show even one photo of the foundation slab, despite thinking about it for a long time, because the thread is explicitly titled “Show us your houses.” 🙂SoL schrieb:
What type of screed are you using for the drying time?A drying time of 6-7 weeks is planned.
W
WilderSueden14 Mar 2022 12:36I'm still not quite sure how to install the door frames three weeks before the scheduled assembly date 😉