ᐅ Additional construction costs for earthworks according to the soil report
Created on: 23 Nov 2021 13:47
R
RichoooGreetings,
we have received our soil survey report and are now trying to estimate a rough position for the earthworks to include in the financing.
Attached is the result of the survey.
We want to build with EcoSystem Haus. The consultant mentioned that we should plan for about 5000€ more. A 30cm (12 inches) soil replacement is already included in the building specification in the survey report.
What do you think about the 5000€—is that realistic?
Best regards, looking forward to your feedback!



we have received our soil survey report and are now trying to estimate a rough position for the earthworks to include in the financing.
Attached is the result of the survey.
We want to build with EcoSystem Haus. The consultant mentioned that we should plan for about 5000€ more. A 30cm (12 inches) soil replacement is already included in the building specification in the survey report.
What do you think about the 5000€—is that realistic?
Best regards, looking forward to your feedback!
O
Osnabruecker23 Nov 2021 18:11Without drilling profiles, this cannot be further estimated.
How thick and what heights do the topsoil and the fill have? If this is not extremely thick, it actually sounds quite good.
The 70 cm (28 inches) of soil replacement for the access road seems oversized from my perspective and should be coordinated with your landscape gardener.
How thick and what heights do the topsoil and the fill have? If this is not extremely thick, it actually sounds quite good.
The 70 cm (28 inches) of soil replacement for the access road seems oversized from my perspective and should be coordinated with your landscape gardener.
Richooo schrieb:
What do you think about the 5000€ estimate, is it realistic? Ask what exactly is included in the estimated 5000€. Just removing 30cm (12 inches) of soil from your site area will already incur additional costs.
ypg schrieb:
Ask what exactly is included in the estimated 5000€. Just the removal of your 30cm (12 inches) of soil over the area will result in additional costs.Do you mean more than the 5000€? I don’t think removal is included in that.
Richooo schrieb:
You mean more than the 5,000€? I don’t think disposal is included in that. No. I understood that you have to spend an additional 5,000€ on top of the earthworks. But now there are undisclosed landfill and disposal fees on top of that...
Richooo schrieb:
Include an approximate budget item for the earthworks in the financing. You’ll need an extra budget item for that as well.
ypg schrieb:
No. I understood that you need to spend an additional €5000 for the earthworks. But now there are also undisclosed landfill and disposal fees…
You will need to add those extra costs for this item.How much do you estimate those to be? I have roughly included a total of €10,000 for everything (including removal and construction access road) based on that €5k figure.