Hello, we are currently building a single-family house with Heinz von Heiden. Yesterday, our intermediate floor slab was poured, and now there is a pile of concrete right in front of our entrance. The site manager says that we have to remove the pile ourselves. Is this legal?
O
Olli-Ka
26 Nov 2020 12:01
Hello,
we also built with Heinz von Heiden back then.
Disposal of construction debris was our responsibility at the time,
and I assume it still is today.
Best regards, Olli
Mycraft26 Nov 2020 12:12
Check your scope of work description to see if site clearance is included.

However, if the scope of work states that, it is probably standard practice for the company. This is also confirmed by the previous speaker.
seat8826 Nov 2020 12:32
That is clearly your problem, so you need to take care of it yourselves.
11ant26 Nov 2020 13:18
My conclusion after three and three-quarter years on this home building forum is at least this: if I build, it definitely won’t be with the favorite guy from @fach1werk ;-)
https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
T
Tassimat
26 Nov 2020 13:21
Iralem2912 schrieb:

Hello, we are currently building a single-family house with Heinz von Heiden. Yesterday, the intermediate ceiling slab was poured, and now there is a pile of concrete right in front of our entrance. The site manager says that we have to remove the pile ourselves. Is this allowed?
Regardless of who created or is responsible for disposing of the pile: If there are still people with heavy machinery or even an excavator on site, have them break down the pile into manageable pieces quickly so that you can dispose of it yourself without having to chip away at it manually.