Hello,

It would be really great if everyone here could just post one or a few pictures showing the current state of their house.

I'll start right away.

For renovations, it’s best to provide a comparison of before and after the remodeling.

Before March 2014:



After May 2015:

Z
Zaba12
3 May 2019 11:22
The moving date has just been confirmed. It will be in either the first or second week of July. Today, the ceilings are being plastered.

Otherwise, everything has been finalized with the plumber, tiler, and parquet installer. The painters have also received their instructions.

This means the construction period will be exactly 9 months.
My construction coordinator is still trying to find a good landscaping contractor for the outdoor area. One declined, the other hasn’t said no yet. We are curious.

In other words, it’s the final sprint now.

The house without L-beams/modeling, without a carport but including waste disposal, architect, insurance, energy consultant, construction supervision, utility connections, painters, and all flooring will cost around €388,000. Essentially, the bare house as a fully finished, move-in ready property.
Climbee3 May 2019 12:40
We have the same timeline. Groundbreaking was on September 3, 2018, and we plan to move in July.

However, we had an almost three-month construction halt due to that dreadful notary.

This means that if everything had gone smoothly (like on the construction site), we would be moving in right now, or would have just moved in.

In any case, the apartment lease has already been terminated as of July 31. So, we need to be in the new house by then!
Z
Zaba12
3 May 2019 13:16
Climbee schrieb:

We have the same timeline. Groundbreaking was on September 3, 2018, and we will move in July.

However, we had an almost three-month construction halt because of that awful notary.

This means: if everything had gone smoothly (like on the building site), we would be moving in right now, or would have just done so.

In any case, the apartment has already been terminated as of July 31. We have to be in the new house by then!
Then I’m keeping my fingers crossed for you.
Tina mit K3 May 2019 14:22
White station wagon parked on unpaved road at construction site with earth pile; house visible on the left


Excavators are out of the picture for now. Next week, the surveyor will come to mark the pile locations for the pile foundation, which is scheduled to take place in calendar week 21.
L
Lumpi_LE
3 May 2019 14:34
Pile foundation? What exactly are you building there?
Tina mit K3 May 2019 14:48
Lumpi_LE schrieb:

Pile foundation? What are you building there?
It’s not about what you build on it, but about how load-bearing the soil is. Our soil is poor, so our bungalow is being built on piles. I don’t want our house to settle like the highway did.