Hello everyone,
We have been following this forum for quite some time, but always as guests. Now that our plans are becoming more concrete and time is running out, we have registered.
We are struggling with finding the best possible layout for the ground floor of our city villa. The house will be built by Weberhaus – 165sqm (1,776 sq ft) excluding the basement – on a 700sqm (7,535 sq ft) sloped plot. It will have two full floors, a basement, and a hipped roof in a Mediterranean style for the exterior.
We currently have two floor plans and are trying to decide which one is more functional and offers better advantages on the ground floor.
We have decided against a straight staircase because we were told it takes up more space.
What do you think? Which floor plan makes more sense? What could we improve? What else should we consider?
We look forward to your feedback!!





We have been following this forum for quite some time, but always as guests. Now that our plans are becoming more concrete and time is running out, we have registered.
We are struggling with finding the best possible layout for the ground floor of our city villa. The house will be built by Weberhaus – 165sqm (1,776 sq ft) excluding the basement – on a 700sqm (7,535 sq ft) sloped plot. It will have two full floors, a basement, and a hipped roof in a Mediterranean style for the exterior.
We currently have two floor plans and are trying to decide which one is more functional and offers better advantages on the ground floor.
We have decided against a straight staircase because we were told it takes up more space.
What do you think? Which floor plan makes more sense? What could we improve? What else should we consider?
We look forward to your feedback!!
hanse987 schrieb:
What is Weberhaus’s delivery time? I guess about 12 months.I heard from a few people back in 2016 that it was around 14 months, and it probably hasn’t improved much since then. But maybe you have something guaranteed in your contract?
S
SirDenniMiles28 Mar 2019 14:26hanse987 schrieb:
What is Weberhaus’s delivery time? I guess about 12 months. We signed the contract last December, and construction will start this October.
SirDenniMiles schrieb:
Our architect said that the “larmgerat” wouldn’t bother anyone there. Well, what about you? It’s right in front of your eyes when you look out to the garden. Of course, you could plant a hedge around it.
I’m not much of a technician, so I don’t really know if the device absolutely has to be placed there, but spoiling the garden side would definitely annoy me.
S
SirDenniMiles28 Mar 2019 14:29DASI90 schrieb:
I heard from a few people that it was around 14 months back in 2016, and it probably hasn't improved much since then. But maybe you have something contractually guaranteed? Now back to our main question,
Everything stays as it is, only the interior walls and stairs can be moved. Does anyone have a better idea or tips? The pantry will be removed. Moving the kitchen forward would be inconvenient because of the floor-to-ceiling window.
S
SirDenniMiles28 Mar 2019 14:31DASI90 schrieb:
I heard from a few people that it took about 14 months (2016), and it's probably not much better now. But maybe something was contractually guaranteed to you? Now back to our main question,
Everything stays as it is, only the interior walls and stairs can be moved. Does anyone have a better idea or advice? The pantry will be removed. Moving the kitchen forward would be inconvenient because of the floor-to-ceiling window.
S
SirDenniMiles28 Mar 2019 14:39SirDenniMiles schrieb:
Now, back to our main question,
Everything stays as it is, only the interior walls and stairs can be moved. Does anyone have better ideas or tips? The pantry will be removed. Moving the kitchen forward would be unwise because of the floor-to-ceiling window.Similar topics