ᐅ Is temporary construction power worth it because it’s more cost-effective? Any experiences?

Created on: 28 Aug 2018 13:20
C
chrisw81
Hello,

there is already a working electrical connection at our property, meaning the distribution box, meter, etc. are all functioning. It would also be possible to install a high-voltage connection.

Is it advisable to have an electrician apply for and install a temporary construction power box here, or does that end up costing the same or more than just paying the regular electricity rates right away?

Christian
C
chrisw81
28 Aug 2018 16:16
Egon12 schrieb:
The expensive part about construction power is not the electricity itself but the box from the electrician, since you rent that.
I think it was about 3 euros per day for us.

Of course, the electricity cost depends on the amount consumed, but the electricity rate doesn’t change whether it goes through a construction meter or a permanent meter.
Do I have to rent the electrician’s box, or can I use an existing one? Are there any differences?
C
chrisw81
28 Aug 2018 16:17
Lobster schrieb:
With us, the hardware is also provided by the construction company and is not charged separately. So I don’t care which meter the electricity runs through.
Unfortunately, I have to take care of something like that...
Y
ypg
28 Aug 2018 17:50
chrisw81 schrieb:
Do I have to rent the distribution box from an electrician, or can I use the existing one? Are there any differences?

You should ask your electricity supplier, from whom you need to get the construction power.
chrisw81 schrieb:
The previous owner installed the distribution panel and meter to have power on the property (in the garage). So could I use the existing distribution panel/meter for the construction power? That way, I wouldn’t need to install or rent a construction power box, right?

That would be the meter linked to their contract... which they likely have already canceled.
N
niri09
28 Aug 2018 21:38
You need to install your own meter or have it installed by an electrician. The electrician is required to report it. At the latest, when the previous owner receives a bill, they will present it to you.
Whether you are allowed to use their box, it is best to ask them.
C
chrisw81
29 Aug 2018 17:00
niri09 schrieb:
You need to have your own meter installed or have it installed by an electrician. The electrician is required to report it. At the latest, when the previous owner receives a bill, they will show it to you.
If you are allowed to use their meter, it’s best to ask them directly.

I have spoken with him and will use his meter (which will then belong to me). It will only get more complicated if I need three-phase power; in that case, I will probably need a separate meter for the three-phase supply.
C
chrisw81
9 Nov 2018 11:34
We had a conversation with the site manager yesterday, and he said we need three-phase power. Currently, there is only a 16A circuit breaker and a single electricity meter on the property.

Would it be easier to set up a temporary construction power box (a second meter) or to connect the three-phase power to the existing meter? (We would need about two new outlets.)